Our facility

We see the need to create more operating capacity in the Hawke’s Bay region and deliver a patient-centric approach.

May 2022: Stage I of the hospital will provide four operating theatres, a recovery area and five overnight beds.

Late 2024: Stage II will have a 23-bed ward, consulting rooms for specialists, a café and pharmacy.

Some fun facts
  • $30 million surgical facility
  • 5,000 operations a year
  • 100 new jobs
  • 4 operating theatres
  • 5 pre-op spaces
  • 11 PACU beds
  • 6 recovery spaces
  • 5 overnight beds with ensuites
  • 124 carparks
  • 3,048m2 floor area
  • 10,000m2 site area
  • 4.2m floor to floor
  • 2.7m – 3.0m high ceilings with
  • 9,500 concrete blocks
  • 2,200 tonnes of concrete
  • 120 tonnes of steel
  • 40,000 bricks
  • 115 interior doors